Free domestic shipping Learn more

Free help & advice. Learn more

30 day exchange period Learn more

  • Free shipping

    On all orders over $100

  • Special offers

    Regular sales and discounts

  • Easy returns

    Hassle free returns policy

  • Chat facility

    Talk to a real person

Grand Opening sale!

Save up to 20% on all orders

GRNDOPN
LV3DPrinting

Kraken.stl Flowline Ceiling Lamp | 3D Printed Pendant Lamp Shade | Modern Hanging Light | Minimalist Ceiling Light | E26 E27 Home Decor

Regular price $38.75 USD
Shipping calculated at checkout.

Size
Lamp Color

Add a stand out message for your customers

Highlight title

Text to highlight a key feature of your product

Description

Transform your living space with the Kraken.stl Flowline Ceiling Lamp, a stunning 3D printed pendant lamp shade inspired by flowing organic motion. Its elegant spiral line pattern and unique dual-wall diffuser create beautifully layered light that fills your room with a soft, warm glow while serving as a striking modern centerpiece.

The sculptural flowing design enhances light diffusion, producing comfortable ambient lighting that is perfect for dining rooms, kitchens, bedrooms, living rooms, offices, entryways, or cozy reading nooks. Even when turned off, the Flowline Ceiling Lamp remains a beautiful decorative statement thanks to its minimalist silhouette and geometric texture.

Designed specifically for translucent and frosted filaments, the layered diffuser gently softens the light to create a warm, balanced atmosphere that complements modern, Scandinavian, Japandi, and contemporary interiors.

Our pendant lamp shades include an optional black or white 10ft hanging light socket cord, as well as a ceiling hook for quick and easy installation.
Designed to accommodate an E26 / E27 LED bulb or standard light bulb, ensuring compatibility with most existing lighting fixtures.
The diameter of the socket opening measures 1.61 inches (41mm). Adjustments can be made at no additional charge to accommodate different socket sizes.

Bring warmth, elegance, and modern sculptural design into your home with this unique Flowline Ceiling Lamp.

Inspired by the graceful movement of flowing lines, the Flowline Ceiling Lamp combines sculptural geometry with functional lighting. Its dual-wall diffuser enhances light diffusion by creating a layered glow that feels soft, warm, and inviting. The elegant ripple pattern transforms the lamp into both a functional light fixture and a contemporary work of art.

____________________________________________________

✦ DESIGNER ✦

Designed by Kraken.stl, a talented designer known for creating innovative modern home décor through advanced 3D printing. Their designs combine artistic creativity with practical functionality, producing timeless pieces that complement a wide variety of interior styles.

____________________________________________________


✦ MATERIAL & SUSTAINABILITY ✦

Printed using durable and environmentally friendly materials.

• PLA - biodegradable and recyclable

• ASA - strong, durable, UV resistant, and heat resistant

Each lamp shade is individually 3D printed layer by layer, making every piece one of a kind.

____________________________________________________


✦ DIMENSIONS ✦

Small

Inches: 7.87 L × 7.87 W × 5.72 H
cm: 20.00 L × 20.00 W × 14.53 H

Medium

Inches: 9.93 L × 9.94 W × 7.22 H
cm: 25.23 L × 25.25 W × 18.34 H

Large

Inches: 12.00 L × 12.00 W × 8.72 H
cm: 30.48 L × 30.48 W × 22.15 H

Extra Large

Inches: 13.50 L × 13.50 W × 9.81 H
cm: 34.29 L × 34.29 W × 24.92 H

____________________________________________________


✦ IMPORTANT INFO ✦

• Lamp shade is 3D printed in PLA or ASA

• Listing price is for one pendant lamp shade

• Optional black or white 10ft hanging light cord available

• Ceiling hook included with cord option

• Light bulb not included

• Designed primarily for indoor use

• Multiple color options available

• Compatible with E26 / E27 light bulbs

• Custom socket sizes available upon request

• Ships with tracking to the USA, Canada, and most international locations

Payment & Security

Payment methods

  • American Express
  • Apple Pay
  • Bancontact
  • Diners Club
  • Discover
  • iDEAL Wero
  • Mastercard
  • Shop Pay
  • Visa

Your payment information is processed securely. We do not store credit card details nor have access to your credit card information.